FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One10.87.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All12.79.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.70.0A
Crankshaft, Renew5.60.0A
Oil Pump, Renew2.00.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew
Manual Trans1.80.0A
Auto Trans1.90.0A
Timing Belt, Renew1.40.0A
Camshaft, Renew
One1.40.0A
Both1.50.0A
Tune-Up0.50.0A