FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder7.45.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.50.3A
All Cylinders10.67.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.50.3A
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew1.90.0A
Crankshaft, Renew
Manual Trans4.40.0A
Auto Trans4.60.0A
Oil Pump, Renew1.00.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew
Manual Trans1.40.0A
Automatic Trans1.90.0A
Camshaft, Renew
Manual Trans4.10.0A
Auto Trans4.10.0A
Timing Chain, Renew
Manual Trans2.90.0A
Auto Trans3.00.0A
Lifters, Renew
One1.80.0A
All1.90.0A
Tune-Up0.50.0A