Fuel Injected
Lower Intake Manifold
Tighten in two steps in numerical sequence to the following specifications:
Step 1 18 N-m (13 lb-ft)
Step 2 22 N-m (16 lb-ft)
Upper Intake Manifold
Tighten in sequence in three (3) steps starting with the four center bolts to the following specifications:
Step 1 10 N-m (8 lb-ft)
Step 2 20 N-m (15 lb-ft)
Step 3 32 N-m (24 lb-ft)