FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank12.08.6AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank10.87.7AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks15.110.8AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cylinders19.513.9AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew2.40.0A
Crankshaft, Renew
Manual Trans4.00.0A
Auto Trans4.10.0A
Oil Pump, Renew0.40.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew1.70.0A
Camshaft, Renew4.40.0A
Timing Chain or Gears, Renew2.60.0A
Lifters, Renew1.70.0A