FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One8.46.0AIncludes: R&R Cylinder Head & Oil Pan. Hone Cylinders & Plastigage Bearings.
All10.97.8AIncludes: R&R Cylinder Head & Oil Pan. Hone Cylinders & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew1.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew
Manual Trans4.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Auto Trans4.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump, Renew1.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Timing Belt, Renew0.80.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Tune-Up0.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.