FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank11.58.2Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank10.87.7Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks14.110.1Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cylinders19.914.2Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew1.70.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Operations.
Crankshaft, Renew5.90.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Operations.
Oil Pump, Renew1.10.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Operations.
Oil Pump Screen, Clean0.20.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Operations.
Rear Main Oil Seal, Renew3.30.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Operations.
Timing Chain or Gears, Renew1.90.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Operations.
Tune-Up0.60.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Operations.