FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder10.87.7Includes R&R Cylinder Head & Oil Pan. Hone Cylinder Wall And Plastigage Bearings.
Note
With AC, Add0.40.2Includes R&R Cylinder Head & Oil Pan. Hone Cylinder Wall And Plastigage Bearings.
4WD
Note
With AC, Add0.40.2Includes R&R Cylinder Head & Oil Pan. Hone Cylinder Wall And Plastigage Bearings.
All Cylinders13.99.9Includes R&R Cylinder Head & Oil Pan. Hone Cylinder Wall And Plastigage Bearings.
Note
With AC, Add0.40.2Includes R&R Cylinder Head & Oil Pan. Hone Cylinder Wall And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew2.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs
Crankshaft, Renew
Manual Trans4.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs
Auto Trans4.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs
Oil Pump, Renew1.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs
Oil Pump Screen, Clean0.20.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs
Rear Main Oil Seal, Renew
Manual Trans1.20.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs
Auto Trans1.30.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs
Tune-Up0.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs