FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank11.98.5AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank11.98.5AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks13.39.5AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cylinders20.314.5AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew2.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew4.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump, Renew1.60.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump Screen, Clean0.10.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Rear Main Oil Seal, Renew1.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Camshaft, Renew2.80.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Timing Chain, Renew1.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Valve Lifters, Renew1.80.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Tune-Up0.70.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.