FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank9.70.0AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank9.00.0AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Each Additional0.50.0AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew2.10.0A
Crankshaft, Renew3.80.0A
Oil Pump, Renew2.10.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew
One Piece Seal1.80.0A
Camshaft, Renew3.70.0A
Timing Chain or Gears, Renew2.10.0A
Lifters, Renew1.40.0A