FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Test 11, Primary Circuit Continuity

Primary circuit continuity test connections:





1. Leave straight pin in green wire as outlined in test 10.
2. Turn ignition ``On,'' then using a suitable voltmeter connected to ground measure voltage at green wire pin, Fig. 7.
3. If voltage exceeds 1.5 volts, proceed to test 13. If voltage obtained is 1.5 volts or less, proceed to test 12.