[4] Check injector bank 2.: Signal line is interrupted.


[4] Check injector bank 2.: Signal line is interrupted.

Test 1: Check injector bank 2.

1. Check injector bank 2.
Possible cause and remedy

- Check lines between control unit N3/9 (CDI control unit) and component Y76y4 (Fuel injector cylinder 4) as well as connections and connectors for damage, correct fitting, loose contact and corrosion, and repair or replace as necessary.
- Check lines between control unit N3/9 (CDI control unit) and component Y76y5 (Fuel injector cylinder 5) as well as connections and connectors for damage, correct fitting, loose contact and corrosion, and repair or replace as necessary.
- Check lines between control unit N3/9 (CDI control unit) and component Y76y6 (Fuel injector cylinder 6) as well as connections and connectors for damage, correct fitting, loose contact and corrosion, and repair or replace as necessary.
End of test