[4] Check injector bank 2.: Signal line is interrupted.
[4] Check injector bank 2.: Signal line is interrupted.
Test 1: Check injector bank 2.
1. Check injector bank 2.
Test 1.1: Check lines between injectors and control module N3/9 (CDI control unit) for Short circuit to ground.
1.1. Check lines between injectors and control module N3/9 (CDI control unit) for Short circuit to ground.
Special tools
- Adapter cable220 589 00 99 35
Test sequence
- Switch off ignition.
- Connect 126-pole socket box at engine wiring harness.
- Connect adapter cable no. 220 589 00 99 35 to engine wiring harness Injectors.
- Measure resistance with multimeter between ground socket and [Y76/1] 1
- Measure resistance with multimeter between ground socket and [Y76/1] 2
- Measure resistance with multimeter between ground socket and [Y76/2] 1
- Measure resistance with multimeter between ground socket and [Y76/2] 2
- Measure resistance with multimeter between ground socket and [Y76/3] 1
- Measure resistance with multimeter between ground socket and [Y76/3] 2
Specified value:
- Resistanceinfinite Ohm?
Question
- Is the measurement value OK?
YES
The measurement value is OK.End of test
NO
The measurement value is not OK.Possible cause and remedy
- Test cable for short circuit to ground.
End of test