AZ40.10-P-0001-10D Reworking Body at Rear Wheel Houses
AZ40.10-P-0001-10D Reworking Body At Rear Wheel Houses
- Only with 255/35 tires R18
1 Edge horizontal sheet metal flange for securing rear apron in rear wheel houses 90° upwards up to approx. 20 mm in front of mounting screw in accordance with bending line (A).
Grind off upper edge of rear apron and its reinforcement in this area.
2 Check clearance between the tire and body when the rear axle is in the full bump position (at least 7 mm).
Use a plastic mallet to avoid damaging paint.
Carefully heat outer edges of fender to max. 70 to 80° C using a hot air blower.
Do not overheat paint when heating up (maximum 80° C).
Repair any damage to the paint.
3 Re-treat the wheel housings with underfloor protection and spray the turned down sheet metal flange with cavity preservation.