Function Test - Section 11
Preparation for Test:
1. Ignition: ON,
2. Side windows open,
3. Fuses ok for PSE control module, electronic ignition switch (EIS),
4. Battery voltage 11 to 14 V,
5. Review Connection and Use of Test Equipment, Component Locations, Connection of Components, Preparation for Test and Pneumatic Test Program.