FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Preparation For Test - Section 22


Preparation For Test:
1. Fuses for PSE system and PSE control module OK, and voltage supply for control modules and CAN lines OK.
2. Battery voltage 11 - 14 V,
3. Provide access to PSE control module (A37),
4. Provide access to combination control module (N10-1),
5. Connect socket box with test cable according to connection diagram.


Special Tools:





Conventional tools, test equipment
Description Brand, model, etc.
Multimeter 1) Fluke models 23, 83, 85, 87

1) Available through the MBNA Standard Equipment Program.


Connection Diagram - Socket Box - Model 210 (sedan shown)

Model 210 (Sedan Shown):





A37 PSE control module, combined functions
001 PSE control module connector
002 Test cable
003 Multimeter
004/050 Socket box (35-pole)






N10-1 Combination control module (model 210)
001 PSE control module connector
002 Test cable
003 Multimeter
050 Socket box (35-pole)