Preparation For Test - Section 33
Figure 1 - Connection Diagram, Delivery Test:
1. Review section: 0. Connection and Use of Test Equipment - Section 0
2. Review Sections: 11, 21, 22, 23, 24, 31.
3. Connect socket box tester to engine control module (N3/10)
NOTE: When disconnecting the connectors on the engine control module remove center connector (D) first, when reconnecting connectors install center connector (D) last.
Special Tools:
Conventional tools, test equipment
Description Brand, model, etc.
Multimeter 1) Fluke models 23, 83, 85, 87
Stop watch Local purchase
Measuring glass (1 liter minimum) Local purchase
1) Available through the MBNA Standard Equipment Program.