Injection Timing: Testing and Inspection
Testing start of delivery with digital tester (RIV method)Connection diagram of digital tester with adapter (without adapter see Adjusting Start of Delivery W/Digital Tester (RIV Method) After Testing) Adjustments
Unscrew plug at governor housing (10/6)
Tightening torque 30-35 Nm.
Unscrew RI sensor (017).
Connect Digital tester (001) and pulse generator (021).
Start Engine.
Read off RI value on digital tester at idle speed.
RI specification: 14° ±0.5° ATDC
Adjust start of delivery, it necessary see Adjusting Start of Delivery W/Digital Tester (RIV Method) After Testing) Adjustments
Perform leak test with engine running
Check engine oil level, adjust to correct level if necessary.
Special tools
Commercially available tools