Procedure Index
Procedure IndexNOTE:
For application identification refer to "Steering : Power Steering Pump : Service and Repair : Overhaul Procedures : Application and ID" Application and ID
LHP:
*Step # Operation:
1 & 25 Breather cap (47) and end cover (45)
- remove and refit.
2 & 25 Self-locking nut (61)
- unscrew, screw on, replace.
2 & 25 Plastic sleeve (60), spring (43) and filter set (41)
- take off, insert.
3 & 24 Vickers/LUK power steering pumps
- unscrew, screw on fluid reservoir (35). 8 Nm. Replace O-ring (21).
4 & 23 Bolts (25)
- unscrew. screw in, take off boaring flange (4). Tightening torque 30-35 Nm.
20 & 22 Pressure plate (3) and cam insert (6)
- take off (number 5). When assembling, insert cam insert with direction of rotation arrow facing up and pressure plate with ground side facing cam insert (6), into the straight pins.
6 & 9 Locking ring (18)
- remove, install and replace.
7,18 & 21 Rotor (7) with vane (16)
- remove (7).
8 & 18 Drive shaft (11)
- remove, insert.
9 & 17 Radial seal ring (13)
- remove and install, replace. Use suitable fitting mandrel.
O-ring (22, 26a, 26b)
- replace.
10 & 16 Locking ring (34a or 34b)
- remove, install Ensure that the flow control valve (32) and the housing bore are not damaged.
11,14 & 15 Flow control valve (32) and compression spring (30)
- remove, install.
12 - 13 Components
- check for signs of wear.
* Step # refers to the steps contained in the neighboring articles, "Disassemble" and "Assemble".