Preparation For Test
Special Tools:
Preliminary work: Perform Function Test. Function Test
WARNING: Before disconnecting the SRS test connection (X11/13 or X29/9), disconnect and cover the battery negative terminal.
Connection Diagram - DMM And Socket Box Tester:
002 Test cable 124 589 35 63 00
003 Digital multimeter
004 Socket box
050 Socket box
X11/13 SRS test connection (10-pole)