Air Intake Actuator Inspection - Manual Air Conditioner
AIR INTAKE ACTUATOR INSPECTION [MANUAL AIR CONDITIONER]
1. Connect battery positive voltage to air intake actuator terminal B (or C), connect terminal C (or B) to ground, and then verify that the air intake actuator operates as shown in the table.
- If the operation condition is not normal, replace the air intake actuator.