Installation
SUSPENSION: FRONT UPPER SUSPENSION ARM (for 2WD): INSTALLATION
HINT
* Use the same procedures for the RH side and LH side.
* The procedures listed below are for the LH side.
* A bolt without a torque specification is shown in the standard bolt chart Suspension Control System.
1. TEMPORARILY TIGHTEN FRONT NO. 1 SUSPENSION UPPER ARM ASSEMBLY LH
(a) Insert the bolt as shown in the illustration. Then temporarily install the front No. 1 suspension upper arm assembly LH to the No. 1 arm attachment plate inner LH with the nut.
2. TEMPORARILY TIGHTEN FRONT NO. 2 SUSPENSION UPPER ARM ASSEMBLY LH
(a) Insert the bolt as shown in the illustration. Then temporarily install the front No. 2 suspension upper arm assembly LH to the No. 2 arm attachment plate inner LH with the nut.
3. INSTALL NO. 1 ARM ATTACHMENT PLATE INNER LH
(a) Install the No. 1 arm attachment plate inner LH with the 3 bolts and spacers.
Torque : 32 Nm (326 kgf-cm, 24 ft-lbf)
4. INSTALL NO. 2 ARM ATTACHMENT PLATE INNER LH
(a) Install the No. 2 arm attachment plate inner LH with the 2 bolts and spacer.
Torque : 32 Nm (326 kgf-cm, 24 ft-lbf)
5. INSTALL STEERING KNUCKLE SUB-ASSEMBLY LH Installation
6. INSTALL FRONT PNEUMATIC CYLINDER LH O-RING (w/ Air Suspension) Installation
7. INSTALL FRONT SHOCK ABSORBER ASSEMBLY LH (w/o Air Suspension) Installation
8. INSTALL PNEUMATIC FRONT LH WITH SHOCK ABSORBER CYLINDER ASSEMBLY (w/ Air Suspension) Installation
9. INSTALL ABSORBER CONTROL ACTUATOR (w/ Air Suspension) Installation
10. INSTALL FRONT SHOCK ABSORBER CAP LH (w/ Air Suspension) Installation
11. INSTALL ENGINE ROOM SIDE COVER LH Installation
12. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY Installation
13. TEMPORARILY TIGHTEN FRONT NO. 2 SUSPENSION LOWER ARM ASSEMBLY LH Installation
14. CONNECT NO. 8 HEIGHT CONTROL TUBE (w/ Air Suspension) Installation
15. REPAIR AIR CONNECTOR CLIP HOLDER (w/ Air Suspension) Installation
16. INSTALL FRONT STABILIZER LINK ASSEMBLY LH Installation
17. CONNECT FRONT HEIGHT CONTROL SENSOR SUB-ASSEMBLY LH Installation
18. CONNECT FRONT NO. 1 SUSPENSION LOWER ARM ASSEMBLY LH Installation
19. CONNECT TIE ROD ASSEMBLY LH Installation
20. INSTALL FRONT DISC BRAKE DUST COVER LH Installation
21. INSTALL FRONT DISC Installation
22. CONNECT FRONT DISC BRAKE CALIPER ASSEMBLY LH Installation
23. CONNECT SPEED SENSOR CONNECTOR Installation
24. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
25. INSTALL COWL TOP VENTILATOR LOUVER RH Installation
26. PERFORM INITIALIZATION Installation
27. STABILIZE SUSPENSION (w/o Air Suspension) Installation
28. STABILIZE SUSPENSION (w/ Air Suspension) Installation
29. TIGHTEN FRONT NO. 1 SUSPENSION UPPER ARM ASSEMBLY LH
(a) Tighten the installation nut of the front No. 1 suspension upper arm assembly LH.
Torque : 50 Nm (510 kgf-cm, 37 ft-lbf)
30. TIGHTEN FRONT NO. 2 SUSPENSION UPPER ARM ASSEMBLY LH
(a) Tighten the installation nut of the front No. 2 suspension upper arm assembly LH.
Torque : 50 Nm (510 kgf-cm, 37 ft-lbf)
31. TIGHTEN FRONT NO. 2 SUSPENSION LOWER ARM ASSEMBLY LH Installation
32. INSTALL FRONT WHEEL
Torque : 140 Nm (1428 kgf-cm, 103 ft-lbf)
33. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT Installation
34. ADJUST VEHICLE HEIGHT Installation
35. INSPECT FOR AIR LEAK Installation
36. VEHICLE PREPARATION FOR HEADLIGHT AIMING ADJUSTMENT Adjustments
37. PREPARATION FOR HEADLIGHT AIMING (Using a screen) Adjustments
38. HEADLIGHT AIMING INSPECTION Adjustments
39. HEADLIGHT AIMING ADJUSTMENT Adjustments