Installation
OTHER SYSTEM: VOLTAGE INVERTER: INSTALLATION
1. INSTALL VOLTAGE INVERTER ASSEMBLY
(a) Install the voltage inverter assembly with the 2 nuts.
Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)
(b) Connect all the connectors.
2. INSTALL FUEL FILLER OPENING LID LOCK SUB-ASSEMBLY
(a) Install the fuel filler opening lid lock sub-assembly Installation.
3. INSTALL LUGGAGE CLOSER MOTOR ASSEMBLY (w/ Power Trunk Lid System)
(a) Install the luggage closer motor assembly Installation.