Installation
AA80E AUTOMATIC TRANSMISSION: PARK / NEUTRAL POSITION SWITCH: INSTALLATION
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Install the switch to the manual valve shaft.
(b) Temporarily install the bolt.
(c) Install a new lock washer with the nut.
Torque : 6.9 Nm (70 kgf-cm, 61 in-lbf)
(d) Temporarily install the control shaft lever.
(e) Turn the control shaft lever counterclockwise until it stops, and then turn it clockwise 2 notches to set it to the N position.
(f) Remove the control shaft lever.
(g) Align the groove with the neutral basic line.
(h) Hold the switch in this position and tighten the bolt.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
(i) Using a screwdriver, bend the tabs of the lock washer.
HINT
Bend at least 2 washer tabs.
(j) Install the transmission control shaft lever with the spring washer and nut.
Torque : 16 Nm (163 kgf-cm, 12 ft-lbf)
(k) Connect the switch connector.
2. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Temporarily connect the shifting rod to the connecting rod swivel with the nut.
HINT
The nut will be tightened to a torque specification during the shift lever position adjustment procedure.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. INSTALL COWL TOP VENTILATOR LOUVER Installation
5. ADJUST SHIFT LEVER POSITION
(a) Adjust the shift lever position AA80E Automatic Transmission.
6. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Inspect the switch AA80E Automatic Transmission.
7. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.