Installation
2UR-GSE EMISSION CONTROL: CANISTER: INSTALLATION
1. INSTALL CHARCOAL CANISTER ASSEMBLY
(a) Install the charcoal canister assembly with the 4 nuts.
Torque : 15 Nm (150 kgf-cm, 11 ft-lbf)
(b) Connect the 2 quick connectors, hose and connector.
(c) Connect the wire harness with the 2 clamps.
2. INSTALL NO. 1 FLOOR UNDER COVER
(a) Install the No. 1 floor under cover with the 3 nuts and 6 clips.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL