FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





2UR-GSE EMISSION CONTROL: CANISTER: INSTALLATION

1. INSTALL CHARCOAL CANISTER ASSEMBLY

(a) Install the charcoal canister assembly with the 4 nuts.





Torque : 15 Nm (150 kgf-cm, 11 ft-lbf)

(b) Connect the 2 quick connectors, hose and connector.





(c) Connect the wire harness with the 2 clamps.





2. INSTALL NO. 1 FLOOR UNDER COVER





(a) Install the No. 1 floor under cover with the 3 nuts and 6 clips.

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL