FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





2UR-GSE EMISSION CONTROL: PURGE VALVE: INSTALLATION

1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY

HINT
The No. 1 vacuum switching valve assembly is the purge valve.

(a) Install the No. 1 vacuum switching valve assembly with the bolt.





Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)

(b) Connect the fuel vapor feed hose and No. 2 fuel vapor feed hose to the No. 1 vacuum switching valve assembly.

(c) Connect the No. 1 vacuum switching valve assembly connector.

2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation