Installation
2UR-GSE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
HINT
The No. 1 vacuum switching valve assembly is the purge valve.
(a) Install the No. 1 vacuum switching valve assembly with the bolt.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(b) Connect the fuel vapor feed hose and No. 2 fuel vapor feed hose to the No. 1 vacuum switching valve assembly.
(c) Connect the No. 1 vacuum switching valve assembly connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation