FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





A760E AUTOMATIC TRANSMISSION: TORQUE CONVERTER AND DRIVE PLATE: INSTALLATION

1. INSTALL TORQUE CONVERTER CLUTCH ASSEMBLY Installation

2. INSTALL TRANSMISSION OIL COOLER Installation

3. INSTALL TRANSMISSION CONTROL SHAFT LEVER RH Installation

4. INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR Installation

5. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY Installation

6. INSTALL WATER BY-PASS HOSE Installation

7. INSTALL WIRE HARNESS Installation

8. CONNECT CONNECTOR Installation

9. INSTALL ENGINE REAR MOUNTING MEMBER Installation

10. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY Installation

11. INSTALL DRIVE PLATE & TORQUE CONVERTER CLUTCH SETTING BOLT Installation

12. INSTALL FLYWHEEL HOUSING SIDE COVER Installation

13. INSTALL STARTER ASSEMBLY Installation

14. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH Installation

15. INSTALL PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY Installation

16. FULLY TIGHTEN NO. 1 CENTER SUPPORT BEARING ASSEMBLY Installation

17. INSPECT AND ADJUST NO. 2 AND NO. 3 JOINT ANGLE Installation

18. INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR Installation

19. INSTALL OUTSIDE AIR GUIDE PLATE RH Installation

20. INSTALL FRONT EXHAUST PIPE ASSEMBLY Installation

21. INSTALL OXYGEN SENSOR Installation

22. INSTALL FRONT CENTER FLOOR BRACE Installation

23. INSTALL NO. 1 REAR FLOOR PANEL BRACE Installation

24. INSTALL NO. 2 FLOOR UNDER COVER Installation

25. INSTALL NO. 1 FLOOR UNDER COVER Installation

26. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

27. ADD COOLANT

Testing and Inspection

28. ADD AUTOMATIC TRANSMISSION FLUID

Procedures

29. ADJUST COOLANT

Testing and Inspection

30. CHECK FOR ENGINE COOLANT LEAKS Testing and Inspection

31. ADJUST SHIFT LEVER POSITION Adjustments

32. INSPECT SHIFT LEVER POSITION Initial Inspection and Diagnostic Overview

33. CHECK FOR EXHAUST GAS LEAKS Installation

34. INSTALL NO. 2 ENGINE UNDER COVER

35. INSTALL ENGINE UNDER COVER

36. INSTALL ENGINE ROOM SIDE COVER LH Installation

37. INSTALL COOL AIR INTAKE DUCT SEAL Installation

38. RESET MEMORY

Programming and Relearning