FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





2GR-FSE EMISSION CONTROL: CANISTER: INSTALLATION

1. INSTALL CHARCOAL CANISTER ASSEMBLY

(a) Install the charcoal canister assembly, 2 spacer and 4 nuts.





Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)

(b) Connect the 2 quick connectors, hose and connector.





(c) Connect the wire harness with the 2 clamps.





2. INSTALL FLOOR UNDER COVER

(a) Install the floor under cover with the 4 clips and 5 nuts.





3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL