Installation
HEATING / AIR CONDITIONING: HEATER GLOW PLUG: INSTALLATION
1. INSTALL WATER BY-PASS GLOW PLUG
(a) Install the water by-pass glow plugs.
Torque : 15 Nm (157 kgf-cm, 11 ft-lbf)
(b) Install the heater blower wires with the 2 nuts and 2 grommets, 2 spring washers, and 2 washers.
Torque : 2.7 Nm (28 kgf-cm, 24 in-lbf)
2. INSTALL HEATER WATER INLET HOSE Installation
3. INSTALL HEATER WATER OUTLET HOSE Installation
4. ADD ENGINE COOLANT
for 2GR-FSE: Service and Repair
for 4GR-FSE: Service and Repair
5. INSPECT FOR COOLANT LEAK
for 2GR-FSE: Testing and Inspection
for 4GR-FSE: Testing and Inspection
6. INSTALL INLET NO. 1 AIR CLEANER (for 2GR-FSE) Installation
7. INSTALL INLET NO. 1 AIR CLEANER (for 4GR-FSE) Installation
8. INSTALL COOL AIR INTAKE DUCT SEAL Installation
9. INSTALL V-BANK COVER SUB-ASSEMBLY (for 2GR-FSE) Installation
10. INSTALL V-BANK COVER SUB-ASSEMBLY (for 4GR-FSE) Installation