Installation
4GR-FSE CHARGING: GENERATOR: INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator bracket with the bolt (A).
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(b) Install the generator bracket with the bolt (B).
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(c) Install the generator assembly with the 2 bolts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
(d) Install the bracket with the nut.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(e) Install the generator wire to terminal B with the nut (A).
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(f) Install the terminal cap.
(g) Install the clamp bracket with the bolt (B).
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(h) Attach the 2 clamps, and connect the generator connector to the generator.
2. INSTALL WIRE HARNESS
(a) Install the wire harness with the 3 nuts (A).
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 2 connectors (B).
3. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY Installation
4. INSTALL NO. 2 ENGINE COVER Installation
5. INSTALL RADIATOR INLET HOSE Installation
6. INSTALL V-RIBBED BELT Installation
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
8. ADD ENGINE COOLANT Testing and Inspection
9. CHECK FOR ENGINE COOLANT LEAKS Testing and Inspection
10. INSTALL NO. 1 INLET AIR CLEANER Installation
11. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
12. INSTALL ENGINE ROOM SIDE COVER LH Installation
13. INSTALL COOL AIR INTAKE DUCT SEAL Installation