FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





4GR-FSE EMISSION CONTROL: PCV VALVE: INSTALLATION

1. INSTALL VENTILATION VALVE

(a) Install the ventilation valve.





(1) Apply adhesive to 2 or 3 threads.

Adhesive:

Toyota Genuine Adhesive 1324, Three Bond 1324 or Equivalent

(2) Install the ventilation valve.

Torque : 27 Nm (275 kgf-cm, 20 ft-lbf)

2. CONNECT VENTILATION HOSE





(a) Connect the ventilation hose to the ventilation valve.

3. INSTALL V-BANK COVER SUB-ASSEMBLY Installation