Installation
4GR-FSE EMISSION CONTROL: CANISTER: INSTALLATION
1. INSTALL CHARCOAL CANISTER ASSEMBLY
(a) Install the charcoal canister assembly and 2 spacers and 4 nuts.
Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)
(b) Connect the 2 quick connectors, hose and connector.
(c) Connect the wire harness with the 2 clamps.
2. INSTALL FLOOR UNDER COVER
(a) Install the floor under cover with the 4 clips and 5 nuts.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL