Installation
4GR-FSE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL PURGE VSV
(a) Install the purge VSV with the bolt.
Torque : 18 Nm (182 kgf-cm, 13 ft-lbf)
(b) Connect the 2 hoses.
(c) Connect the connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation