Installation
2AZ-FXE EMISSION CONTROL: CANISTER: INSTALLATION
1. INSTALL CHARCOAL CANISTER ASSEMBLY
(a) Install the charcoal canister assembly with the 3 bolts and clip.
Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)
(b) Connect the vent line tube.
Text in Illustration
(1) Connect the pipe to the vent line tube connector, as shown in A in the illustration. Then push up the retainer to lock the claws, as shown in B in the illustration.
NOTICE:
* Check that there are no scratches or foreign matter around the connected parts of the vent line tube connector and pipe before performing this work.
* After connecting the vent line tube, check that the vent line tube is securely connected by pulling the vent line tube connector and pipe.
(c) Connect the purge line hose, air inlet line tube and wire harness connector.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
3. INSTALL REAR SUSPENSION MEMBER SUB-ASSEMBLY
(a) Install the rear suspension member sub-assembly Installation.