Installation
1UR-FSE EMISSION CONTROL: CANISTER: INSTALLATION
1. INSTALL CHARCOAL CANISTER ASSEMBLY
(a) Install the charcoal canister assembly, 2 spacers and 4 nuts.
Torque : 14.7 Nm (150 kgf-cm, 11 ft-lbf)
(b) Connect the 2 quick connectors, hose and connector.
(c) Connect the connector with the 2 clamps.
2. INSTALL FLOOR UNDER COVER
(a) Install the floor under cover with the 3 nuts and 6 clips.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization