Installation
A760E AUTOMATIC TRANSMISSION: FLOOR SHIFT ASSEMBLY: INSTALLATION
1. INSTALL FLOOR SHIFT ASSEMBLY
(a) Install the floor shift with the 4 bolts.
Torque : 8.3 Nm (85 kgf-cm, 73 in-lbf)
(b) Connect the 2 connectors to the floor shift.
(c) Connect the 6 clamps.
2. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Temporarily tighten the floor shift gear shifting rod with the nut.
HINT
The rod is tightened to a torque specification in the "ADJUST SHIFT LEVER POSITION" procedure.
3. ADJUST SHIFT LEVER POSITION Adjustments
4. INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR Installation
5. INSTALL FRONT EXHAUST PIPE ASSEMBLY
(a) Install the front exhaust pipe Installation.
6. INSTALL NO. 2 ENGINE UNDER COVER
7. INSTALL NO. 2 CONSOLE BOX DUCT Installation
8. INSTALL CONSOLE BOX Installation
9. INSTALL CONSOLE BOX REGISTER ASSEMBLY Installation
10. REMOVE CONSOLE BOX PLATE Installation
11. INSTALL INSTRUMENT PANEL FINISH PANEL END LH Installation
12. INSTALL INSTRUMENT PANEL FINISH PANEL END RH Installation
13. INSTALL CONSOLE UPPER PANEL ASSEMBLY Installation
14. INSTALL FRONT CONSOLE UPPER PANEL GARNISH Installation
15. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
16. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
17. INSPECT SHIFT LEVER POSITION Initial Inspection and Diagnostic Overview
18. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.