FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





3UZ-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION

1. INSTALL PURGE VSV





(a) Install the purge VSV with the bolt.

Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)

(b) Connect the 2 hoses and connector.

2. INSTALL V-BANK COVER

(a) Install the cover with the 2 nuts.

Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

4. PERFORM INITIALIZATION

(a) Perform initialization Testing and Inspection.

NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.