Installation
3UZ-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL PURGE VSV
(a) Install the purge VSV with the bolt.
Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)
(b) Connect the 2 hoses and connector.
2. INSTALL V-BANK COVER
(a) Install the cover with the 2 nuts.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. PERFORM INITIALIZATION
(a) Perform initialization Testing and Inspection.
NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.