Installation
HORN: LOW PITCHED HORN: INSTALLATION
1. INSTALL LOW PITCHED HORN
(a) Place the stay onto the baffle part of the radiator support upper, and then install the horn with the bolt.
Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)
(b) Connect the horn connector.