FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation





HORN: HIGH PITCHED HORN: INSTALLATION

1. INSTALL HIGH PITCHED HORN





(a) Place the stay onto the baffle part of the radiator support upper, and then install the horn with the bolt.

Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)

(b) Connect the horn connector.