FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation








3UZ-FE EMISSION CONTROL: CANISTER: INSTALLATION

INSTALLATION

1. INSTALL CANISTER ASSEMBLY





(a) Install the canister with the 4 nuts.
Torque: 5.5 Nm (56 kgf-cm, 49 in-lbf)





(b) Connect the 3 hoses.
(1) Connect the air inlet line hose to the canister (leak detection pump).
(2) Connect the vent line hose.
(3) Connect the purge line hose.





(c) Connect the connector.
2. CONNECT REAR DRIVE SHAFT ASSEMBLY RH
(a) Install the rear drive shaft assembly Installation.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.