FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation








3UZ-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION

INSTALLATION





1. INSTALL PURGE VSV
(a) Install the purge VSV with the bolt.
Torque: 18 Nm (184 kgf-cm, 13 ft-lbf)
(b) Connect the 2 hoses and connector.
2. INSTALL V-BANK COVER
(a) Install the cover with the 2 nuts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.