Installation
AIR CONDITIONING: BLOWER UNIT: INSTALLATION
INSTALLATION
1. INSTALL BLOWER ASSEMBLY
(a) Install the blower and attach the claw.
(b) Install the 3 screws, bolt and nut.
(c) Attach the claw and connect the connector.
(d) Connect the connector and attach the blower to the clamp.
2. INSTALL NO. 2 AIR DUCT
(a) Install the air duct and 2 screws.
3. INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
(a) Install the instrument panel safety pad Installation.
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
5. RESET RADIO RECEIVER ASSEMBLY TO SHIPMENT MODE
6. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.