FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation








1UR-FSE COOLING: COOLING FAN ECU: INSTALLATION

INSTALLATION

1. INSTALL COOLING FAN ECU





(a) Install the ECU with the 2 screws.
Torque: 2.6 Nm (27 kgf-cm, 23 in-lbf)
(b) Connect the 3 connectors.
2. INSTALL NO. 1 AIR CLEANER INLET Installation
3. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY Installation
4. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
6. INSTALL COWL TOP VENTILATOR LOUVER RH Installation
7. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.