Installation
A960E AUTOMATIC TRANSMISSION: SHIFT LEVER ASSEMBLY: INSTALLATION
INSTALLATION
1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
(a) Install the floor shift assembly with the 4 bolts.
Torque: 8.3 Nm (85 kgf-cm, 73 in-lbf)
(b) Connect the connector to the floor shift assembly.
2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Install the floor shift gear shifting rod sub-assembly with the nut.
Torque: 13 Nm (133 kgf-cm, 9 ft-lbf)
3. INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR Installation
4. INSTALL FRONT EXHAUST PIPE ASSEMBLY Installation
5. INSTALL OXYGEN SENSOR Installation
6. INSTALL FRONT CENTER FLOOR BRACE Installation
7. INSTALL NO. 1 REAR FLOOR PANEL BRACE Installation
8. INSTALL NO. 2 FLOOR UNDER COVER Installation
9. INSTALL NO. 1 FLOOR UNDER COVER Installation
10. INSTALL NO. 2 CONSOLE BOX DUCT Installation
11. INSTALL CONSOLE BOX Installation
12. INSTALL CONSOLE BOX REGISTER ASSEMBLY Installation
13. INSTALL FRONT ASH RECEPTACLE SUB-ASSEMBLY Installation
14. INSTALL CONSOLE PANEL SUB-ASSEMBLY Installation
15. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH Installation
16. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH Installation
17. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
18. ADJUST SHIFT LEVER POSITION Adjustments
19. INSPECT SHIFT LEVER POSITION Shift Lever Assembly
20. CHECK FOR EXHAUST GAS LEAKS Installation