FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation








4GR-FSE EMISSION CONTROL: PCV VALVE: INSTALLATION

INSTALLATION

1. INSTALL VENTILATION VALVE





(a) Install the ventilation valve.
(1) Apply adhesive to 2 or 3 threads.
Adhesive:
Toyota Genuine Adhesive 1324, Three Bond 1324 or Equivalent
(2) Install the ventilation valve.
Torque: 27 Nm (275 kgf-cm, 20 ft-lbf)





2. CONNECT VENTILATION HOSE
(a) Connect the ventilation hose to the ventilation valve.
3. INSTALL V-BANK COVER SUB-ASSEMBLY Installation