Installation
2GR-FSE ENGINE CONTROL SYSTEM: INTEGRATION RELAY: INSTALLATION
INSTALLATION
1. INSTALL INTEGRATION RELAY
(a) Connect the 3 connectors.
(b) Attach the integration relay to the engine room No. 2 relay block.
(c) Install the engine engine room No. 1 relay block cover.
2. INSTALL ENGINE ROOM SIDE COVER LH Installation
3. INSTALL COOL AIR INTAKE DUCT SEAL Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
5. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.