FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Removal








2GR-FSE IGNITION: IGNITION COIL:

REMOVAL

1. DISCONNECT BATTERY NEGATIVE TERMINAL
2. REMOVE V-BANK COVER SUB-ASSEMBLY Removal

3. REMOVE COOL AIR INTAKE DUCT SEAL Removal

4. REMOVE ENGINE ROOM SIDE COVER RH Removal

5. REMOVE ENGINE ROOM SIDE COVER LH Removal

6. DISCONNECT NO. 2 VENTILATION HOSE






(a) Disconnect the ventilation hose from the cylinder head.
7. REMOVE AIR CLEANER CAP SUB-ASSEMBLY
8. REMOVE IGNITION COIL ASSEMBLY






(a) Disconnect the 2 wire harness clamps.






(b) Disconnect the 6 ignition coil connectors.
(c) Remove the 6 bolts and the 6 ignition coil assemblies.