Installation
2GR-FSE COOLING: THERMOSTAT: INSTALLATION
1. INSTALL WATER INLET SUB-ASSEMBLY WITH THERMOSTAT
(a) Install a new gasket and the water inlet with thermostat with the 3 nuts.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
2. CONNECT NO. 2 RADIATOR HOSE
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. ADD ENGINE COOLANT Service and Repair
5. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection
6. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
7. INSTALL NO. 1 AIR CLEANER INLET Installation
8. INSTALL COOL AIR INTAKE DUCT SEAL Installation
9. INSTALL ENGINE UNDER COVER (for 2WD)
10. INSTALL ENGINE UNDER COVER (for 4WD)
11. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.