Installation
2GR-FE EMISSION CONTROL: PCV VALVE:
INSTALLATION
1. INSTALL VENTILATION VALVE
(a) Install the ventilation valve.
(1) Apply adhesive to 2 or 3 threads.
Adhesive:
Part No. 08833-00070, THREE BOND 1324 or equivalent.
(2) Install the ventilation valve.
Torque: 27 Nm (275 kgf-cm, 20 ft-lbf)
NOTE: Do not start the engine within 1 hour after installation.
2. CONNECT VENTILATION HOSE
(a) Connect the ventilation hose to the ventilation valve.
3. INSTALL V-BANK COVER SUB-ASSEMBLY Installation