Front
FRONT BRAKE FLEXIBLE HOSECOMPONENTS:
REMOVAL
HINT:
^ Use the same procedure for the RH side and LH side.
^ The procedure listed below are for the LH side.
1. REMOVE FRONT WHEEL
2. DRAIN BRAKE FLUID
3. REMOVE FRONT BRAKE FLEXIBLE HOSE
(a) Remove the brake tube with a SST while holding the front brake flexible hose with a wrench.
SST 09023-00101
NOTICE:
^ Do not bend or damage the brake tube.
^ Do not allow any foreign matter such as dirt and dust to enter the brake tube from the connecting points.
(b) Remove the clip.
(c) Remove the union bolt, the front brake flexible hose and gasket.
INSTALLATION
1. INSTALL FRONT BRAKE FLEXIBLE HOSE
(a) Connect the front brake flexible hose with the union bolt and a new gasket.
Torque:
2GR-FSE 30 N*m (306 kgf*cm, 22 ft.*lbf)
3UZ-FE 39 N*m (400 kgf*cm, 29 ft.*lbf)
NOTICE: Install the flexible hose lock securely in the lock hole in the disc brake cylinder assembly front
(b) Connect the brake tube to front brake flexible hose with a SST while holding flexible hose with a wrench.
SST 09023-00101
Torque: 15 N*m (155 kgf*cm, 11 ft.*lbf)
NOTICE:
^ Do not bend or damage the brake tube
^ Do not allow any foreign matter such as dirt and dust to enter the brake tube from the connecting points.
(c) Install the front brake flexible hose with a new clip.
NOTICE:
^ When installing the front brake flexible hose, face the identification mark to the outside of the vehicle and minimize twisting of the hose.
^ Install the clip as it will go.
^ Pay attention to the color of the identification mark (RH: white/white, LH: white/blue) because the front brake flexible hose is different between right and left (4WD vehicle).
2. DISABLE BRAKE CONTROL (for 3UZ-FE)
3. ADD RESERVOIR WITH BRAKE FLUID (for 2GR-FSE)
4. ADD RESERVOIR WITH BRAKE FLUID (for 3UZ-FE)
5. BLEED BRAKE LINE (for 2GR-FSE)
6. BLEED FRONT BRAKE SYSTEMS (for 3UZ-FE)
7. BLEED REAR BRAKE SYSTEM (for 3UZ-FE)
8. INSPECT FLUID LEVEL IN RESERVOIR (for 2GRFSE)
9. CHECK BRAKE FLUID LEVEL (for 3UZ-FE)
10. CHECK AND CLEAR DTC (for 2GR-FSE)
11. CHECK AND CLEAR DTC (for 3UZ-FE)
12. INSPECT BRAKE FLUID LEAKAGE
13. INSTALL FRONT WHEEL
Torque: 103 N*m (1,050 kgf*cm, 76 ft.*lbf)