Variable Valve Timing Actuator: Service and Repair
Camshaft Timing Oil Control Valve Assy:
RH BANK
REPLACEMENT
1. REMOVE V-BANK COVER [11259]
a. Remove the V-bank cover by removing the 2 nuts.
2. REMOVE AIR CLEANER INLET NO.1 [17751]
3. REMOVE INTAKE AIR CONNECTOR PIPE [17875]
a. Disconnect the air hose and ventilation hose No.1.
b. Remove the intake air connector pipe by removing the bolt and hose clamp.
4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSY [11101J]
a. Disconnect the oil control valve connector.
b. Remove the bolts and oil control valve.
5. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSY [11101J]
a. Install the oil control valve with the bolt.
Torque: 8.5 N.m (85 kgf.cm, 75 in.lbf)
b. Connect the oil control valve connector.
6. INSTALL INTAKE AIR CONNECTOR PIPE [17875]
a. Install the intake air connector pipe with the bolt and the hose clamp.
Torque:
4 N.m (40 kgf.cm, 35 in.lbf) (hose clamp)
5 N.m (50 kgf.cm, 44 in.lbf) (bolt)
7. INSTALL AIR CLEANER INLET NO.1 [17751]
8. INSTALL V-BANK COVER [11259]
Torque: 5 N.m (50 kgf.cm, 44 in.lbf)
Camshaft Timing Oil Control Valve Assy:
LH BANK
REPLACEMENT
1. REMOVE V-BANK COVER [11259]
a. Remove the V-bank cover by removing the 2 nuts.
2. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSY [11101J]
a. Disconnect the oil control valve connector.
b. Remove the bolts and oil control valve.
3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSY [11101J]
a. Install the oil control valve with the bolt.
Torque: 8.5 N.m (85 kgf.cm, 75 in.lbf)
b. Connect the oil control valve connector.
4. INSTALL V-BANK COVER [11259]
Torque: 5 N.m (50 kgf.cm, 44 in.lbf)